2020年7月1日 星期三

ISS Daily Summary Report – 6/30/2020

Payloads Plant Habitat-02 Latch Evaluation: Following issues experienced with the Environmental Control System (ECS) installation a few weeks ago, the crew performed a more detailed inspection of the failed locking mechanism on the new ECS.  The inspection went well and the crew was able to lock and unlock the ECS system in the current configuration.  …

July 01, 2020 at 12:00AM
from NASA https://ift.tt/2NYacbX
via IFTTT

沒有留言:

張貼留言