2017年6月2日 星期五

ISS Daily Summary Report – 6/01/2017

SpaceX (SpX)-11 Launch: SpX-11 is scheduled to launch today at 4:55 pm CDT. Pending a successful launch, capture and berthing are planned for Sunday, June 4th at 9:00am CDT. Rodent Research-5 (RR-5):  The crew unpacked, installed and configured four Animal Habitats and configured the Microgravity Science Glovebox (MSG) for RR-5 operations to be performed after arrival of rodents and additional hardware and materials on SpaceX-11. The Ground team successfully completed a software checkout of all the Habitats. DOSIS 3D:  The crew de-installed DOSIS 3D passive detectors and handed them over to a Russian crewmember for packing for return on Soyuz 49S.  Data from the various active and passive radiation detectors are used in the determination of the radiation field parameters absorbed doses and dose equivalents inside the ISS. A concise three dimensional (3D) dose distribution map of all the segments of the ISS will be developed based on this data and data from JAXA and NASA monitoring devices. Matiss:  The crew de-installed the four Matiss Sample Holders from the Columbus module for return on 49S.  The MATISS experiment investigates the antibacterial properties of materials in space to see if future spacecraft could be made easier to clean. The experiment aims to understand the mechanisms of attachment of biofilms in microgravity conditions. MATISS objectives include simplification of decontamination operations to save crew time and validation of innovative surfaces for use in future spacecraft. ISS Change of Command: In preparation for 49S departure on Friday, Peggy Whitson handed over command of the ISS to Fyodor Yurchikhin. During this event, the entire crew discussed with Mission Control Center (MCC)-Houston and MCC-Moscow Flight Control their roles and responsibilities for the timeframe between the Change of Command event and tomorrow’s 49S departure.  Following the Change of Command, the new Commander’s Soyuz crew became prime for emergencies.  Today’s Planned Activities All activities were completed unless otherwise noted. Recharging Soyuz 733 Samsung PC Battery Soyuz 733 Stowage Ops and completing the right seat container packing Note 5 CASKAD. Connecting Anabioz Incubator to РБС and Power Up Rodent Research Habitat Install DOSIS 3D Passive Detectors De-Installation from Columbus (10 PDPs and 1 TDP). ISS RAM Handover to RS Crew for Soyuz Return On-Board Training (OBT) Dragon Emergency Review DOSIS 3D Passive Detector Pouch handover to Russian crew for download of dosimeters with Soyuz. Deinstallation of Matiss Sample Holders Rodent Research Habitat Install CASKAD. Starting Anabioz No. 2 Battery Charge STRUKTURA. Deactivation of crystallization process Photography Cyclops ICE Experiment Photos Rodent Research Habitat Install STRUKTURA.  Transfer of Luch-2 bag to Soyuz 733 Group Combustion Module (GCM)  Gas Bottle Unit Air (GBU) Change HRF Generic Ambient Blood Collection Setup Replacement of urine receptacle (МП) and filter-insert (Ф-В) in АСУ. [АСУ] Activation after Replacement Combustion Integrated Rack Alignment Guide Install Soyuz 733 right seat container transfer completion report (S-band) Combustion Integrated Rack Upper Rack Doors Open Signing ISS RS Handover Protocol On-Board Training (OBT) Dragon Emergency Review Combustion Integrated Rack Manifold Bottle Replacement Ultrasound 2 HRF Rack 1 Power On Crew Departure Preparations for Return to Earth Rodent Research Node 2 Camcorder Video Setup Combustion Integrated Rack Upper Rack Doors Close Rodent Research Microgravity Science Glovebox LSAH Setup Terminate Soyuz 733 Samsung PC Battery Recharge VHF2 Comm Test from Soyuz 733 via RGS Health Maintenance System (HMS) Ultrasound 2 Scan Prep Health Maintenance System (HMS) Ultrasound 2 Scan Health Maintenance System (HMS) Ultrasound 2 Data Export Group Combustion Module (GCM)  Gas Bottle Unit Air (GBU) Leak Check Public Affairs Office (PAO) High Definition (HD) Config LAB Setup Change of Command Health Maintenance System (HMS) Stow Reminder HRF Generic Ambient Blood Collection Reminder Rodent Research Thermal Consideration Soyuz 733 [СА] cooling down prior to descent Reminder 1 HRF Generic Saliva Collection Completed Task List Items None Ground Activities All activities were completed unless otherwise noted. RR5 Habitat Install support Change of Command  Three-Day Look Ahead: Friday, 06/02: 49S undock/landing, OBT Dragon vehicle ops, Zbook deploy Saturday, 06/03: Crew off duty, housekeeping Sunday, 06/04: SpX-11 capture/berthing/vestibule outfitting QUICK ISS Status – Environmental Control Group:   Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off           [СКВ] 2 – SM Air Conditioner System (“SKV2”) Off Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Manual Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Process Trace Contaminant Control System (TCCS) Lab Full up Trace Contaminant Control System (TCCS) Node 3 Off  

June 02, 2017 at 12:00AM
from NASA http://ift.tt/2rjeRdK
via IFTTT

沒有留言:

張貼留言