2018年1月5日 星期五

ISS Daily Summary Report – 1/4/2018

NanoRacks External Platform (NREP)-3 Payload Swap:  Today crewmembers extended the JEM A/L slide table into the JEM Pressurized Module (JPM) and exchanged payloads on NREP by removing the External Platform Module 2 (Charge Injector Device), External Platform Module 4 (Dependable Microprocessor) before installing the External Platform Module 5 (Cavalier) on NREP. The slide table was … Continue reading "ISS Daily Summary Report – 1/4/2018"

January 05, 2018 at 12:00AM
from NASA http://ift.tt/2EcCU1Q
via IFTTT

沒有留言:

張貼留言