USOS Extra Vehicular Activity (EVA) #45: Today Randy Bresnik (as EV1) and Mark Vande Hei (as EV2) successfully performed US EVA #45 with a Phased Elapsed Time (PET) of 6:26. The primary goal of today’s EVA was to Remove and Replace (R&R) the External Television Camera Group (ETVCG) located at Camera Port 9 (CP9) and to lubricate the newly installed Latching End Effector (LEE) A on the Space Station Robotic Manipulator System (SSRMS). The LEE A was installed onto the SSRMS last week during USOS EVA #44. Additional tasks accomplished include: Airlock High Pressure Gas Tank (HPGT) handle tie back, rotation of the Pump/Flow Control Subassembly (PFCS), R&R of the Mobile Base System (MBS) mast Camera/Light/PTU Assembly (CLPA) lens cover, removal of a handrail from Node 3, and BDCU MLI Removal. At Home in Space: The crew took photographs today to document the current on-orbit ISS culture. This Canadian Space Agency investigation assesses culture, values, and psychosocial adaptation of astronauts to a space environment shared by multinational crews on long-duration missions. It is hypothesized that astronauts develop a shared space culture that is an adaptive strategy for handling cultural differences and they deal with the isolated confined environment of the spacecraft by creating a home in space. At Home in Space also uses questionnaires to investigate individual and culturally related differences, family functioning, values, coping with stress, and post-experience growth. Today’s Planned Activities All activities are on schedule unless otherwise noted. Extravehicular Activity (EVA) Reminder for EVA In-Suit Light Exercise (ISLE) Preparation External Wireless Instrumentation System Network Control Unit EVA Inhibit LAB Wireless Access Point Port Inhibit ISS HAM Radio and Video Power Down USOS Extravehicular Activity (EVA) Communication Configuration EVA COTS UHF Communication Unit (CUCU) Verify off USOS Window Shutter Close Extravehicular Activity (EVA) In-Suit Light Exercise (ISLE) Preparation KUBIK Temperature Adjustment to 20°C Verify that SM Window Shutters #6, 8, 9, 12, 13, 14 are closed. CALCIUM. Session 7 of the Experiment Extravehicular Mobility Unit (EMU) Purge Monitoring of ИП-1 Sensors Installation Extravehicular Mobility Unit (EMU) In-Suit Light Exercise (ISLE) Prebreathe Video Recording of Greetings VIZIR. Preparation. Tagup with specialists if required PK-4 Flexhose connection to Cleaning gas bottle Crewlock Depress Crewlock Post Depress Crewlock Egress Airlock High Pressure Gas Tank (HPGT) Reconfig SSRMS Setup and Worksite Interface (WIF) Adapter Install SSRMS EVA Support Articulating Portable Foot Restraint (APFR) and Worksite Interface Extender (WIFEX) Setup [АСУ] Set R&R Pump and Flow Control Subassembly (PFCS) Rotate СОЖ Maintenance CP9 External TV Camera Group (ETVCG) R&R Vacuum Cleaning of Ventilation Screens on FGB Interior Panels 201, 301, and 401 VIZIR. Closeout Operations Mobile Base System (MBS) Mast Camera Light Pan-Tilt Assembly (CLPA) Lens Cover R&R SSRMS Cleanup Special Purpose Dexterous Manipulator (SPDM) Latching End Effector (LEE) Lube Worksite Interface (WIF) Adapter Remove Worksite Cleanup Node 3 Handrail Remove Articulating Portable Foot Restraint (APFR) Cleanup SPLANKH. Preparation for the Experiment Crewlock Ingress IMS Delta File Prep Regenerative Environmental Control and Life Support System (RGN) Wastewater Storage Tank Assembly (WSTA) Fill [Deferred] At Home In Space Culture Photo PK-4 Flexhose disconnection from Cleaning bottle ACME Session Review EVA Glove Photo Setup Crewlock Pre Repress Crewlock Repress Extra Vehicular Activity (EVA) Post-EVA Activities Post Extravehicular Activity (EVA) Communication Deconfiguration EVA Glove Photo Downlink Extravehicular Activity (EVA) Camera Image Downlink Photo/TV Extravehicular Activity (EVA) GoPro Downlink Metal Oxide (METOX) Regeneration Initiation External Wireless Instrumentation System (EWIS) Network Control Unit (NCU) Enable LAB Wireless Access Point Port Enable Completed Task List Activities At Home In Space Questionnaire [GMT 283] Stowage audit of COL Endcone [GMT 283] Total Organic Carbon Analyzer (TOCA) Protoflight Unit #3 (PFU3) Close Out and Stow [GMT 283] Ground Activities All activities are on schedule unless otherwise noted. Support for EVA Standard commanding Three-Day Look Ahead: Wednesday, 10/11: Urine Transfer, ACME Chamber Install and Config, Neuromapping, HAM Radio Ops Thursday, 10/12: CIR Ops and ACME Config, WHC Dose Pump R&R, EVA 46 Tool Config Friday, 10/13: ETVCG Build, FIR Reconfiguration, DECLIC Hose Return, EVA Procedure Review and Conference QUICK ISS Status – Environmental Control Group: Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off [СКВ] 2 – SM Air Conditioner System (“SKV2”) On Carbon Dioxide Removal Assembly (CDRA) Lab Operate Carbon Dioxide Removal Assembly (CDRA) Node 3 Startup Major Constituent Analyzer (MCA) Lab Idle Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Standby Trace Contaminant Control System (TCCS) Lab Full Up Trace Contaminant Control System (TCCS) Node 3 Off
October 11, 2017 at 12:00AM
from NASA http://ift.tt/2wO6PtW
via IFTTT
沒有留言:
張貼留言