2017年10月5日 星期四

ISS Daily Summary Report – 10/04/2017

Radiation Dosimetry Inside ISS-Neutron (RaDI-N) Retrieval:  Today a USOS crewmember retrieved all 8 of the Space Bubble Detectors that were deployed last week for the RaDI-N experiment, and transferred them to the Russian crewmember for processing in the Bubble Reader. This Canadian Space Agency (CSA) RaDI-N investigation measures neutron radiation levels while onboard the ISS.  Bubble detectors are used as neutron monitors designed to only detect neutrons and ignore all other radiation. Extra Vehicular Activity (EVA) preparations:  Today the crew performed EVA tether inspections, tool configurations, cuff checklist printing, scheduled health checkups, and procedure reviews in preparation for the tomorrow’s EVA.  The primary goal of tomorrow’s EVAs is to Remove and Replace (R&R) a Space Station Remote Manipulator System (SSRMS) Latching End Effector (LEE) which had been exhibiting some anomalies in its operation. Lab Carbon Dioxide Removal Assembly (CDRA) Blower Speed Test – Today, ground controllers began a 7 day test of the Lab CDRA using higher blower speeds. The CDRA blower speed will be gradually increased to determine the ability of the CDRA blower to operate at increased speeds without triggering software responses to excessive speed and to evaluate impacts of elevated speed to the blower. Today’s Planned Activities All activities were completed unless otherwise noted. Preventive Maintenance of FS1 Laptop (Cleaning and rebooting) Health Maintenance System (HMS) Periodic Health Status (PHS) Pre EVA Examination Monthly BRI Cleaning RELAКSATSIYA. Charging battery for Relaksatstiya experiment (initiate) Health Maintenance System (HMS) Periodic Health Status (PHS) Evaluation Acoustic Dosimeter Setup Day 2 Public Affairs Office (PAO) High Definition (HD) Config LAB Setup Relocate PBAs for upcoming EVA Live TV Conference with VKontakte Hostess US Extravehicular Activity (EVA) Tether Inspection BIOCARD. Operator Assistance During the Experiment BIOCARD. Experiment Session Extravehicular Activity (EVA) Tool Configuring Extravehicular Mobility Unit (EMU) Cuff Checklist Print Extravehicular Activity (EVA) Tool Audit. Onboard Training (OBT) Robotics On-board Trainer (ROBoT) Setup Public Affairs Office (PAO) Social Media Event Intermodular TORU Test with Mated Progress 436 Scheduled monthly maintenance of Central Post Laptop. Laptop log-file downlink via OCA Extravehicular Activity (EVA) Procedure Review СОЖ maintenance Extravehicular Activity (EVA) Procedure Conference MATRYOSHKA-R. BUBBLE-Dosimeter Retrieval And Readout ISS HAM Video Color Bar and Tone Deactivation CONTENT. Experiment Ops Radi-N Detector Retrieval/Readout Radiation Dosimetry Inside ISS-Neutrons Hardware Handover RELAKSATSIYA. Hardware Setup MATRYOSHKA-R. Handover of BUBBLE-dosimeters from USOS Station Support Computer (SSC) 9/17 Laptop Relocate for EVA Portable Onboard Computers (POC) Dynamic Onboard Ubiquitous Graphics (DOUG) Setup HRF2 Supply Kit Inventory Delta file prep RELAKSATSIYA. Parameter Settings Adjustment PELLE Data Download & placement before EVA RELAKSACIA. Observation Equipment Lock (E-LK) Preparation RELAKSATSIYA. Closeout Ops and Hardware Removal  Completed Task List Activities Crew Support LAN (CSL) 1 hard drive swap and client reload [Active] Ground Activities All activities were completed unless otherwise noted. CDRA blower speed test Commanding for EVA preparation Periodic Lab CDRA checkout Three-Day Look Ahead: Thursday, 10/05: US EVA 44: LEE-A R&R Friday, 10/06: Eye Exams, EVA Debrief, EVA Preps, STPH5 Photo, Insitu, BEAM IMV Insp, Meteor H/D Swap Saturday, 10/07: EVA Tool Config, DOUG Review, EVA Procedure Review QUICK ISS Status – Environmental Control Group:   Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off           [СКВ] 2 – SM Air Conditioner System (“SKV2”) On Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Idle Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Standby Trace Contaminant Control System (TCCS) Lab Full up Trace Contaminant Control System (TCCS) Node 3 Off  

October 05, 2017 at 12:00AM
from NASA http://ift.tt/2y2q3PJ
via IFTTT

沒有留言:

張貼留言