2019年5月20日 星期一

NASA's Predecisional Notional Plan For The #Moon2024 Thing

https://s3.amazonaws.com/images.spaceref.com/news/2019/artemis.plan.jpg

NASA's full Artemis plan revealed: 37 launches and a lunar outpost, Ars Technica

"Last week, an updated plan that demonstrated a human landing in 2024, annual sorties to the lunar surface thereafter, and the beginning of a Moon base by 2028, began circulating within the agency. A graphic, shown below, provides information about each of the major launches needed to construct a small Lunar Gateway, stage elements of a lunar lander there, fly crews to the Moon and back, and conduct refueling missions."

Larger view



from NASA Watch http://bit.ly/30te6OZ
via IFTTT

沒有留言:

張貼留言