NASA's full Artemis plan revealed: 37 launches and a lunar outpost, Ars Technica
"Last week, an updated plan that demonstrated a human landing in 2024, annual sorties to the lunar surface thereafter, and the beginning of a Moon base by 2028, began circulating within the agency. A graphic, shown below, provides information about each of the major launches needed to construct a small Lunar Gateway, stage elements of a lunar lander there, fly crews to the Moon and back, and conduct refueling missions."
from NASA Watch http://bit.ly/30te6OZ
via IFTTT
沒有留言:
張貼留言