2017年3月22日 星期三

ISS Daily Summary Report – 3/21/2017

Intracranial Pressure & Visual Impairment (IPVI):  The crew obtained both front-on and profile view pictures to check for facial edema followed by a conference with ground teams.  Scheduled at Launch + 4 months (L+4m), the IPVI investigation studies changes to crewmembers’ eyes and optic nerves by analyzing arterial blood pressure and blood flow to the brain before and after spaceflight. The IPVI investigation uses non-invasive methods as compared to current invasive methods (spinal tap) to measure intracranial pressure. Extravehicular Activity (EVA) #40 Preparations: The crew participated in a briefing covering the following preparations: Crew member specific reminders Suit specifics and refreshers Key points in an emergency EVA day procedure sequence EVA day comm overview for suits Hardware management The crew is also performed the following: Onboard Training (OBT) EVA Robotics Onboard Trainer (ROBoT) session. Verified Simplified Aid for EVA Rescue (SAFER) is functional prior to EVA. Installed Rechargeable EVA Battery Assembly (REBA) in EMUs 3006 and 3008. Verified EMU 3006 and 3008 glove heater functionality. Environmental Health System (EHS) Surface Sample Kit (SSK), Microbial Air Samper (MAS): The crew pre-gathered items for MAS and SSK sampling planned for tomorrow. Mobile Servicing System (MSS) Operations: Yesterday and overnight, Robotics Ground Controllers powered up the MSS and walked the Space Station Remote Manipulator System (SSRMS) off the Lab Power Data Grapple Fixture (PDGF) onto the Functional Cargo Block (FGB) PDGF.  They then performed a survey of the Starboard side of 48 Soyuz (48S).  When the survey was completed, Controllers walked the SSRMS off the FGB PDGF onto the Lab PDGF and maneuvered the SSRMS to a park position.  MSS performance was nominal. Tracking and Data Relay Satellite (TDRS) 275 Recovery:  Overnight, TDRS 275 returned to service for S-Band and Ku-Band. The communications satellite had been out of service due to timeout event which occurred on 3/16/17. The TDRS Network continues to investigate the root cause of the anomaly. Today’s Planned Activities All activities were completed unless otherwise noted. KORREKTSIYA. Logging Liquid and Food (Medicine) Intake MORZE. Logging Liquid and Food (Medicine) Intake Photography of RS windows (3, 5, 6, 7, 8, 9, 26 in SM) VIZIR. Experiment set up and start using СКПИ P/L Diagnostics of FGB Power Supply System Filter Units (БФ-2) and Main Bus Assembly (БСШ-2) with Infra-Red camera.  Monitoring RS structural shell surfaces using Multipurpose Eddy Current Device МВП-2К (Cross-section of SA setup).  Collecting atmospheric condensate samples [КАВ] from [СРВ-К2М] up to Gas-Liquid Mixture Filter (ФГС) to Russian Samplers, terminate Sampling atmospheric condensate [КАВ] upstream of СРВ-К2М БКО (Water Purification Column Unit), configuration set up, sampler installation (drink bag) Data prep on monitoring RS structural surfaces for downlink via OCA In Flight Maintenance (IFM) Waste and Hygiene Compartment (WHC) Full Fill Sampling atmospheric condensate [КАВ] upstream of БКО СРВ-К2М, Sampler Change out (drink bag) Intracranial Pressure & Visual Impairment (IPVI) Face Photo-taking ASEPTIC. Samples photo after incubation БРП-М water sampling to drink bags VIZIR. СКПИ Closeout Ops Charging EVA Camera D4 Battery Extravehicular Activity (EVA) Procedure Review SVO-ZV water sampling to Russian drink bags ASEPTIC Photo Edit and Downlink Filling (separation) of ЕДВ (КОВ) for Elektron or ЕДВ-СВ Preparing for Changing Replaceable Condensate Removal Lines.  ASEPTIC. Cryogem-03 Removal Delta file prep MORZE. Experiment setup Extravehicular Activity (EVA) Airlock Unstow Simplified Aid For EVA Rescue (SAFER) Checkout On-board Training (OBT) EVA Robotics Onboard Trainer (ROBoT) Session Robotic Workstation (RWS) Teardown Surface Sampler Kit (SSK) and Microbial Air Sampler (MAS) Gather Rechargeable EVA Battery Assembly (REBA) Installation Sampling Condensate Water [КАВ] upstream of [СРВК-2М] БКО (Water Purification Column Unit), sampler (drink bag) removal, configuration teardown Rechargeable EVA Battery Assembly (REBA) Powered Hardware Checkout Completed Task List Items ARED Detent Follow Up (Completed GMT 79) Carbon Dioxide Monitor (CDM) Set-up (Completed GMT 79) ESA Active Dosimeter Area Monitoring Mobile Unit Stow (Completed GMT 79) EVA Fluid QD Fam (Completed GMT 79) Crew evaluation of EveryWear Medical Module Medication list (Completed GMT 79) PMM Cleanup (Completed GMT 79) Carbon Dioxide Monitor (CDM) Data Download (Completed GMT 79 and 80) Ground Activities All activities were completed unless otherwise noted. ROBoT OBT support SSRMS walkoff from N2 PDGF A to MBS3 Three-Day Look Ahead: Wednesday, 03/22: MELFI Icebrick Install, MSL SCA Exchange, Surface/Microbial Sampling, BEAM Ingress/Google Streetview, EVA Preps (ROBoT, Camera Config), CMO OBT Thursday, 03/23: EVA Preps (Procedure Review/Conf, Tool Config, Equip Lock Prep, Tool Audit) Friday, 03/24: EPIC MDM/SPDM Lube EVA, Orbital-7 Launch QUICK ISS Status – Environmental Control Group:   Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off           [СКВ] 2 – SM Air Conditioner System (“SKV2”) On Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Standby Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) ReProcess Trace Contaminant Control System (TCCS) Lab Off Trace Contaminant Control System (TCCS) Node 3 Full Up  

March 22, 2017 at 12:00AM
from NASA http://ift.tt/2nmPN3R
via IFTTT

沒有留言:

張貼留言