2016年9月21日 星期三

ISS Daily Summary Report – 09/20/2016

Japanese Experiment Module Airlock (JEMAL) Repressurization: This morning, FE-5 initiated a repress of the JEMAL then performed a leak check of the airlock.  Later this week, the crew will remove the NRCSD from the airlock.  Water Monitoring Suite – Microbial Monitoring System (WMS – MMS): FE-6 began operations with the MMS subset of the WMS experiment.  The crew reviewed an On-Board Training (OBT) video then configured the hardware to sample a low and high DNA concentration sample using the Razor Polymerase Chain Reaction (PCR) Microbial Monitoring System.  The WMS is a set of hardware that monitors microbes, silica and organic material in the water supply on the ISS. The hardware ensures crew members can test and monitor the safety of their water supplies on future space missions, especially on long-duration missions to Mars, asteroids or other destinations where Earth-based testing would be difficult or impossible. Electrostatic Levitation Furnace (ELF) Sample Removal: FE-5 removed a sample from the ELF Experiment Volume and replaced it with a new sample.  Ground controllers will use the new sample to continue the checkout of the software and facility.  The next planned use of the ELF facility is the Group Combustion experiment, currently scheduled for next week. The Group Combustion investigation tests a theory that fuel sprays change from partial to group combustion as flames spread across a cloud of droplets. In the Multi-purpose Small Payload Rack in the Kibo module, droplets of decane, a component of gasoline or kerosene, are arranged randomly on thin-fiber lattice points, and the flame and droplet positions and temperature distribution are measured as the flame spreads. Microgravity blocks convection, which on Earth would quickly disperse the droplets and combustion products before such measurements could be made.  Eli Lilly Hard To Wet Surfaces: FE-6 set up the Hard to Wet Surfaces Sample Module image, injected buffer solutions into the sample vials then mixed all six sample vials inside the Sample Module.  The crew aligned and focused the D2Xs Camera and took manual photos utilizing EarthKAM software on the SSC. Automated photography was then initiated using the D2Xs Camera’s intervalometer. The Hard to Wet Surfaces (Eli Lilly-Hard to Wet Surfaces) investigation studies how certain materials used in the pharmaceutical industry dissolve in water while in microgravity. Results from this investigation could help improve the design of tablets that dissolve in the body to deliver drugs, thereby improving drug design for medicines used in space and on Earth. Cell Biology Experiment Facility (CBEF) Closeout: The crew performed closeout following the Mouse Epigenetics experiment.  FE-5 removed, cleaned, and stowed the Mouse Habitat Unit, Glovebox, and Backup Power units.  CBEF is a JAXA subrack facility located in the Saibo (living cell) Experiment Rack. The CBEF is used in various life science experiments, such as cultivating cells and plants in the Japanese Experiment Module (JEM). The CBEF consists of an incubator and control equipment for control and communications. The incubator unit consists of a microgravity compartment and a 1-G compartment. The 1-G compartment has a centrifuge that can control gravity from 0.1 to 2.0 G during gravity contrast experiments with the microgravity compartment. The CBEF incubator can control temperature, humidity, and carbon dioxide concentration for cultivation of cells and plants.  Today’s Planned Activities All activities are on schedule unless otherwise noted. ВКС Laptops Antivirus software checkout Health Maintenance System (HMS) Vision Test Regeneration of Micropurification unit (БМП) Ф1cartridge (begin) JEM Airlock Press Health Maintenance System (HMS) Vision Questionnaire Health Maintenance System (HMS) Vision Test Microbial Monitoring System On-Board Training Review Laptop vent grills maintenance Microbial Monitoring System Hardware Gather Health Maintenance System (HMS) Vision Questionnaire Microbial Monitoring System MWA Preparation JEM Airlock Leak Check KOSMOKARD. Closeout XF305 Camcorder Setup Electrostatic Levitation Furnace(ELF) Sample Removal Laptop vent grills maintenance Microbial Monitoring System Sample Setup Regenerative Environmental Control and Life Support System (RGN) WSTA Fill Flushing of БВ1, БВ2 connectors of Progress #432 (Aft) Rodnik system Dose Tracker Data Entry Subject Public Affairs Office (PAO) High Definition (HD) Config JEM Setup Microbial Monitoring System Sample PAO Preparation Public Affairs Office (PAO) Event in High Definition (HD) – JEM Mouse Epigenetics Closeout Part2 Microbial Monitoring System Data Transfer Glove Box Closeout 5 Hard To Wet Surfaces Sample Processing ТГК 63P stowage operations with the use of IMS (СИ) Cell Biology Experiment Facility (CBEF) Configuration Change 2 Plug-in Plan Universal Serial Bus Charger Deploy Cell Biology Experiment Facility (CBEF) Backup Power Retrieve Hard To Wet Surfaces Sample Remix. 48 Soyuz Wireless Station Support Computer (SSC) Connect Regenerative Environmental Control and Life Support System (RGN) WSTA Fill Hard To Wet Surfaces Sample Remix. Habitability Walk-through Video – Subject Hard To Wet Surfaces Sample Remix. Delta file prep СОЖ maintenance Hard To Wet Surfaces Sample Remix Set 2 Hard To Wet Surfaces OBT Review Hard To Wet Surfaces Sample Remix. Crew Medical Officer (CMO) On Board Training (OBT) Hard To Wet Surfaces Sample Remix Set 3 Hard To Wet Surfaces Sample Remix Set 4 CONTENT. Experiment Ops URISYS Hardware Setup Hard To Wet Surfaces Image Transfer SPLANKH. Diet Restrictions Reminder Regeneration of Micropurification unit (БМП) Ф1 cartridge (finish) Completed Task List Items Manufacturing Device Print Removal, Clean and Stow Orbital Trash Prep  Ground Activities All activities are on schedule unless otherwise noted. Battery 4B1 Reconditioning Plasma Contactor Unit (PCU) Annual Checkout Three-Day Look Ahead: Wednesday, 09/21: Ocular Health, Personal CO2 Monitor, Clean Bench Valve Checkout, MSPR Combustion Chamber Adapter Plate Thursday, 09/22: Ultrasound Scan, Water Hydraulics Components R&R, MMS sample Friday, 09/23: Plant RNA, Cubesat Deployer Removal from MPEP QUICK ISS Status – Environmental Control Group:                               Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) On [СКВ] 2 – SM Air Conditioner System (“SKV2”) Off Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Idle Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Standby Urine Processing Assembly (UPA) Process Trace Contaminant Control System (TCCS) Lab Off Trace Contaminant Control System (TCCS) […]

September 21, 2016 at 12:00AM
from NASA http://ift.tt/2couoDs
via IFTTT

沒有留言:

張貼留言