2017年6月2日 星期五

Vice President Pence to Visit NASA’s Johnson Space Center for Astronaut Class Announcement

Vice President Mike Pence will visit NASA's Johnson Space Center in Houston on Wednesday, June 7, to welcome America’s newest astronaut candidates, chosen from more than 18,000 applicants to carry the torch for future human space exploration.

June 02, 2017
from NASA http://ift.tt/2rAAiYm
via IFTTT

India enters the big league with new, powerful rocket

Sridhar NarayananJune 2, 2017

India enters the big league with new, powerful rocket

GSLV-MK3's first fully operational flight scheduled for June 5

The countdown has begun for the first fully operational flight of the Indian Space Research Organization’s most powerful rocket to date: The Geostationary Launch Vehicle Mark 3, or GSLV-MK3.

Liftoff is scheduled for Monday, June 5 at 7:58 a.m. EDT (11:58 UTC, 17:28 local time in India). The rocket will launch from the second launch pad at the Satish Dhawan Space Center at Sriharikota on the southeastern coast of India. 

The GSLV-MK3 can haul about 8 metric tons to low-Earth orbit and 4 metric tons to geostationary transfer orbit, putting its capacity just shy of the no-booster version of United Launch Alliance’s stalwart Atlas V.

It is also the first new launcher for ISRO in more than a decade. The GSLV-MK3 uses a completely new design from the ground up, with little resemblance to India’s workhorse Polar Satellite Launch Vehicle (PSLV) and its variants, or the GSLV-MK1 and GSLV-MK2 vehicles that evolved from the PSLV design.

GSLV-MK3 launcher

ISRO / NASA / JPL-Caltech / Brown University

GSLV-MK3 launcher

Fully assembled GSLV-MK3 launcher on its launch pad at the Satish Dhawan Space Center.

A short history of the Indian Space Research Organization

The Indian Space Research Organization (ISRO) traces its origins to 1962, when its predecessor, the Indian National Committee for Space Research, was established. It set up the first rocket launch station at the southern tip of the Indian peninsula at Thumba, from where a NASA suborbital sounding rocket, the Nike Apache, was launched in 1963. This site served as an active launch station for sounding rockets from NASA, the French space organization CNES, the Russian space agency, and also India’s indigenously developed Rohini-series sounding rockets for upper atmosphere research.

ISOR rocket component transportation

ISRO

ISOR rocket component transportation

Rocket component being transported on a bicycle in the early days of the Indian Space Program.

In 1969, the Department of Space and ISRO were formed, and a program to develop an orbital launcher was initiated soon thereafter, along with programs for developing satellites and their applications. This led to the first test of the all-solid four stage SLV-3 launcher in 1979, which was unsuccessful, but quickly followed by a successful test in 1980. After two other tests of this launcher, ISRO developed a follow-on launcher called the Augmented Satellite Launch Vehicle, or ASLV.

SLV-3 launch vehicle lifting off

ISRO

SLV-3 launch vehicle lifting off

The ASLV rocket added two strap-on solid-fueled boosters to the SLV-3 and used a slightly enlarged payload fairing to accommodate bigger payloads. Both the SLV-3 and ASLV were technology demonstrator vehicles that could place 40 and 150 kilograms, respectively into low-Earth orbit.

Fully assembled ASLV on its launch pedestal

ISRO

Fully assembled ASLV on its launch pedestal

The PSLV, India’s first operational launcher, arrives

The first operational launcher from the ISRO stable was the Polar Satellite Launch Vehicle (PSLV), which debuted in 1993. While the first test of this launcher was not successful, it has had a remarkably successful run of 37 flawless launches since then, with only a single launch termed a partial success.

The PSLV was developed to place a payload of 1 metric tons into an 800-kilometer-high polar, sun-synchronous orbit, which is ideal for Earth observation satellites. The rocket’s original configuration was a four-stage vehicle with two solid stages and two hypergolic liquid stages, as well as solid-fueled strap-on boosters. Since its debut, the PSLV has evolved to have three variants with varying configurations to achieve different payload capacities. The most powerful PSLV-XL version has launched geostationary communications and weather satellites, satellites for India’s own regional version of the Global Positioning System (GPS), an orbiter around the Moon, and even a Mars orbiter, in addition to the Earth observation and scientific satellites it was originally designed to launch.

PSLV-XL lifting off from the Satish Dhawan Space Center

ISRO

PSLV-XL lifting off from the Satish Dhawan Space Center

Developing cryogenic engine technology: the GSLV

The follow-on launcher to the PSLV was the Geostationary Launch Vehicle, or GSLV. This vehicle retained the two lower stages of the PSLV and replaced its two upper stages with a more powerful cryogenic stage, and also replaced the solid strap-on boosters with more powerful hypergolic liquid boosters. This launcher, designed to place 2 metric tons into geostationary transfer orbit (GTO), has had a more checkered history. The project was delayed due to international pressure on Russia, which was contracted to transfer cryogenic engine technology for the GSLV’s upper stage to ISRO. Due to this pressure, Russia backed out of the contract and instead supplied India with seven, off-the-shelf cryogenic engines without transfer of technology. These were used for the GSLV-MK1 rocket, the first of which was launched in 2001. Six of these vehicles were launched, but only two were complete successes. Two launches were partial failures, where the launcher (and specifically its cryogenic stage) underperformed and placed the satellites in lower orbits than planned. Two other flights were failures with the complete destruction of the vehicles.

GSLV-MK2 just after lift-off from Satish Dhawan Space Center

ISRO

GSLV-MK2 just after lift-off from Satish Dhawan Space Center

Simultaneously with the GSLV-MK1 program, ISRO initiated development of its own cryogenic engine that, like the Russian-supplied engines, used liquid hydrogen and oxygen for propellant. This stage powered the GLSV-MK2 launcher, a slightly more powerful version of the GSLV-MK1, with the capability to launch 2.2 metric tons to GTO. 

After an initial failed test in 2010, the launcher has had four consecutive successes, and has been declared an operational vehicle. In addition to launching communications satellites to geostationary orbit, it is scheduled to launch the Chandrayaan-2 orbiter/lander/rover mission to the moon.

Bigger and more powerful: The GSLV-MK3

The original ISRO plan was to have a two-launcher family—the PSLV and GSLV—to launch Earth observation and communications satellites of the 1 and 2 metric ton class, respectively. But as the sizes of satellites—particularly, communications satellites—grew, and as ISRO expanded into other areas of space research including planetary exploration, the need for a more powerful launcher increased. 

This led to the development of the GSLV-MK3 launcher. Despite bearing the nomenclature of its predecessors, the new rocket has little resemblance to the earlier vehicles. Unlike the solid/liquid/cryogenic stages of the GSLV-MK1 and GSLV-MK2, with liquid strap-on boosters, the GSLV-MK3 has two powerful solid booster engines, a clustered hypergolic liquid core stage and a more powerful liquid hydrogen/liquid oxygen cryogenic upper stage than the GSLV-MK2. This vehicle is designed to place satellites weighing 4 metric tons into geostationary transfer orbit, or 8-metric-ton payloads into low-Earth orbit.

The GSLV-MK3 vehicle has two S-200 solid booster engines with 200 metric tons of hydroxyl-terminated polybutadiene (HTPB) as propellant in each, and providing over 5 mega-newtons thrust in each of the two engines. This engine is one of the most powerful solid-fueled rocket engines ever developed.

The core stage of the launcher has a two-engine cluster of ISRO’s Vikas liquid engine. The Vikas, derived from the French Viking engine developed for the Ariane program, powers various stages in all the variants of the PSLV and GSLV. This stage, referred to as the L-110 stage, carries 110 metric tons of hypergolic propellant, which burns spontaneously when the fuel, unsymmetrical dimethylhydrazine (UDMH) and oxidizer, dinitrogen tetroxide (N2O4) are mixed together. This core stage provides an additional 1.5 mega-newtons of thrust.

The GSLV-MK3’s C-25 upper stage has a liquid hydrogen/liquid oxygen CE-20 cryogenic engine that carries 25 metric tons of propellant and generates 200 kilo-newtons of thrust. Cryogenic engines have the highest specific impulse (efficiency of propellant) of all types of engines and are frequently employed in heavy lift launch vehicles. They are also the most complicated of all the kinds of engines used in rocketry, with only a handful of players in the U.S., Russia, Europe, China, Japan and now India possessing the closely guarded technology.

While the GSLV-MK3 cryogenic engine is not the first cryogenic engine developed by ISRO (the GSLV-MK2 employs a smaller cryogenic engine), it is a new design, using a different combustion cycle. This upcoming launch will be the first time this engine is flight-tested. The C-25 cryogenic upper stage is crucial for the vehicle since about half of the 10-kilometers-per-second final velocity imparted to the payload at the time of injection into orbit is provided by this stage.

GSLV-MK3 upper stage

ISRO

GSLV-MK3 upper stage

The C-25 cryogenic upper stage of the GSLV-MK3, awaiting integration into the vehicle.

While this is the first flight test of the GSLV-MK3 launch vehicle in its full configuration, it is not the first test of the vehicle itself. The vehicle was flight tested with a dummy cryogenic upper stage, but live solid boosters and liquid core stage, in December 2014. This was a suborbital test, with the vehicle taking its payload up to an altitude of about 125 kilometers and a velocity of about 5 kilometers per second, insufficient to inject it into orbit. The payload was a prototype of a proposed future crew vehicle that could be used for a future, yet-to-be-approved human spaceflight program for which ISRO has been steadily developing and testing enabling technologies. 

The 2014 test qualified the booster and core stages and allowed the organization to study the performance of the launcher in its crucial low-atmospheric phase, when the vehicle is subject to the greatest stresses due to denser atmosphere. It also tested the atmospheric re-entry and braking systems of the crew vehicle, which splashed down into the sea and was recovered. For the upcoming test on June 5th, the launch vehicle has been slightly modified to improve its aerodynamics, with an ogive payload fairing instead of the conventional shape used by ISRO so far, and new nose cones for the two S-200 solid boosters, amongst other changes.

GSLV-MK3 CARE

ISRO

GSLV-MK3 CARE

Liftoff of the GSLV-MK3 crew module atmospheric reentry (CARE) experimental flight.

Future applications

Speaking of enabling technologies for future crewed missions, the GSLV-MK3 itself is one of the crucial enabling technologies. ISRO proposes to human-qualify the vehicle. A launch vehicle carrying a human crew should not just have high level of redundancies built in to ensure the lowest possible probability of failure; it needs to be designed to have low enough G-forces to ensure crew safety and comfort. Additionally, technologies will have to be developed for crew escape at various stages of launch to allow the crew to bail out in case of a failure.

The design of the GSLV-MK3, with a payload capacity of 8 metric tons to low-Earth orbit, and an over 100-cubic-meter payload fairing volume with a large 5-meter diameter makes it the most suitable of all ISRO launchers for future crewed missions.

In addition to crewed missions, the launcher will enable ISRO to greatly expand the scope of its space science missions. ISRO’s initial focus was on developing satellites and applications to serve the people of India, along with the launchers to place these payloads into orbit. While it launched several space science satellites and payloads over the last several decades—including the sounding rockets that initiated the space program—the exploration of the solar system and beyond has been added as an area of focus for the organization in recent years. The Chandrayaan-1 Moon orbiter, the Mars Observer Mission to Mars, and the Astrosat X-ray telescope satellite are examples of such missions.

All of these missions have been launched using the PSLV launcher, with its payload capacity of about 1300 kilograms to GTO (lower for interplanetary missions), thereby limiting the size and scope of the space vehicles launched. The follow-on Chandrayaan-2 orbiter/lander/rover mission to the Moon plans to use the GSLV-MK2 launcher with its somewhat greater payload capacity, but the GSLV-MK3 will greatly expand the size and scope of future interplanetary missions of ISRO. Three such missions currently in the planning stage are a follow-on mission to Mars, a mission to Venus, and a satellite proposed to be placed in the L1 Lagrangian orbit to study the Sun. 

Crewed missions and planetary science apart, the main reason for the development of the GSLV-MK3 is to launch heavier commercial satellites to geostationary orbit. ISRO’s heaviest communications satellites are already in the 3 metric ton weight range, and the organization currently lacks the capability to launch them using its own launchers, relying on Arianespace instead. With the qualification of GSLV-MK3, ISRO will finally succeed in its quest to develop, build and launch its own payloads into space without relying on other organizations. In addition to its own missions, the rocket also provides ISRO greater options in the competitive commercial satellite launch market, where it could only offer its services for small satellites so far—mostly Earth-observation and experimental/research satellites. With the GSLV-MK3, ISRO can offer launch services for heavy communications satellites.

The June 5 test of the GSLV-MK3 will carry GSAT-19, an experimental communications satellite with Ka/Ku band high-throughput transponders, an instrument to study the effects of space radiation on satellites in geostationary orbit, and several other experimental technologies to be tested for use in future operational satellites. The satellite, with a liftoff mass of 3136 kilograms, uses the same I-3K satellite bus as ISRO’s operational large commercial satellites. Subsequent launches of GSLV-MK3 propose to place operational communications satellites of ISRO into orbit.

Moving GSLV-MK3

ISRO

Moving GSLV-MK3

GSLV-MK3 being moved to the launch pad from the Vehicle Assembly Building in the background.

Next steps

If the test launch on June 5 is successful, ISRO will conduct a series of development flights of the launcher over the next two to three years before declaring it operational. As is the general practice in the space industry, the envelope of the launcher’s capabilities will be gradually expanded over time. Its payload capacity will be expanded and different flight profiles tested, including to other orbits and potentially interplanetary trajectories. The proposed payload capability of about 4 metric tons to GTO will be realized in future missions.

The launcher has significant growth potential and is proposed to evolve into a new family of launch vehicles, sometimes referred to by ISRO as the Unified Modular Launch Vehicle (UMLV), or simply the Unified Launch Vehicle (ULV) family. A new engine under development for converting the GSLV-MK3 into the ULV family is the SCE-200 semi-cryogenic engine using kerosene and liquid oxygen as fuel and oxidizer, respectively, and generating 2 mega-newtons of thrust. This high-thrust engine, likely in a clustered configuration with two or more engines in the core stage would potentially replace the L-110 core liquid stage of the GSLV-MK3. Coupled with enhancements to the booster stages and the cryogenic upper stage, the upgraded core stage could significantly enhance the payload capability of the launcher to 6 metric tons to GTO and beyond —placing it among the most powerful rockets currently available. While the configurations of future launchers are yet to be finalized, the vision of the ULV proposal is to provide a family of launchers with a range of capabilities, while sharing common components, including engines and stages, to take advantage of economies of scale and to simplify the development process. If developed, the ULV family of launchers derived from the GSLV-MK3 could replace the PSLV and its derivatives such as the GSLV-MK2 as the set of ISRO workhorse launchers.

June 5 is a very important date for ISRO, since it heralds the coming of age of the organization, and its emergence on the world stage as a significant player in space transportation. Coupled with the new opportunities in commercial and space exploration missions for which the new launcher opens the doors, this date could be hugely consequential—not just in the history of ISRO and India, but through its potential to add India to the list of significant space faring nations, in the history of space exploration itself.

MER
Let's Change the World

Become a member of The Planetary Society and together we will create the future of space exploration.

Join Today

Emily Lakdwalla
The Planetary Fund

Support enables our dedicated journalists to research deeply and bring you original space exploration articles.

Donate



from Planetary Society Blog http://ift.tt/2rNSkai
via IFTTT

Behold Jupiter

Keith's note: Stop what you are doing and watch this full screen with the sound turned to maximum so as to enjoy the sountrack excerpt from "2001: A Space Odyssey". Video by Gerald Eichstädt reconstructed from JunoCam Images and SPICE Data.



from NASA Watch http://ift.tt/2rzFjAv
via IFTTT

A South Polar Pit or an Impact Crater?


This observation from NASA's Mars Reconnaissance Orbiter show it is late summer in the Southern hemisphere, so the Sun is low in the sky and subtle topography is accentuated in orbital images. via NASA http://ift.tt/2s25Hnd

Media Invited to Demonstrations of NASA Drone Traffic Management Technologies

NASA’s three-week national campaign to further test and refine its Unmanned Aircraft Systems (UAS) Traffic Management (UTM) technologies continues, and media are invited to see these technologies in action Tuesday, June 6, at four Federal Aviation Administration (FAA) test sites across the country.

June 02, 2017
from NASA http://ift.tt/2qIzL38
via IFTTT

ISS Daily Summary Report – 6/01/2017

SpaceX (SpX)-11 Launch: SpX-11 is scheduled to launch today at 4:55 pm CDT. Pending a successful launch, capture and berthing are planned for Sunday, June 4th at 9:00am CDT. Rodent Research-5 (RR-5):  The crew unpacked, installed and configured four Animal Habitats and configured the Microgravity Science Glovebox (MSG) for RR-5 operations to be performed after arrival of rodents and additional hardware and materials on SpaceX-11. The Ground team successfully completed a software checkout of all the Habitats. DOSIS 3D:  The crew de-installed DOSIS 3D passive detectors and handed them over to a Russian crewmember for packing for return on Soyuz 49S.  Data from the various active and passive radiation detectors are used in the determination of the radiation field parameters absorbed doses and dose equivalents inside the ISS. A concise three dimensional (3D) dose distribution map of all the segments of the ISS will be developed based on this data and data from JAXA and NASA monitoring devices. Matiss:  The crew de-installed the four Matiss Sample Holders from the Columbus module for return on 49S.  The MATISS experiment investigates the antibacterial properties of materials in space to see if future spacecraft could be made easier to clean. The experiment aims to understand the mechanisms of attachment of biofilms in microgravity conditions. MATISS objectives include simplification of decontamination operations to save crew time and validation of innovative surfaces for use in future spacecraft. ISS Change of Command: In preparation for 49S departure on Friday, Peggy Whitson handed over command of the ISS to Fyodor Yurchikhin. During this event, the entire crew discussed with Mission Control Center (MCC)-Houston and MCC-Moscow Flight Control their roles and responsibilities for the timeframe between the Change of Command event and tomorrow’s 49S departure.  Following the Change of Command, the new Commander’s Soyuz crew became prime for emergencies.  Today’s Planned Activities All activities were completed unless otherwise noted. Recharging Soyuz 733 Samsung PC Battery Soyuz 733 Stowage Ops and completing the right seat container packing Note 5 CASKAD. Connecting Anabioz Incubator to РБС and Power Up Rodent Research Habitat Install DOSIS 3D Passive Detectors De-Installation from Columbus (10 PDPs and 1 TDP). ISS RAM Handover to RS Crew for Soyuz Return On-Board Training (OBT) Dragon Emergency Review DOSIS 3D Passive Detector Pouch handover to Russian crew for download of dosimeters with Soyuz. Deinstallation of Matiss Sample Holders Rodent Research Habitat Install CASKAD. Starting Anabioz No. 2 Battery Charge STRUKTURA. Deactivation of crystallization process Photography Cyclops ICE Experiment Photos Rodent Research Habitat Install STRUKTURA.  Transfer of Luch-2 bag to Soyuz 733 Group Combustion Module (GCM)  Gas Bottle Unit Air (GBU) Change HRF Generic Ambient Blood Collection Setup Replacement of urine receptacle (МП) and filter-insert (Ф-В) in АСУ. [АСУ] Activation after Replacement Combustion Integrated Rack Alignment Guide Install Soyuz 733 right seat container transfer completion report (S-band) Combustion Integrated Rack Upper Rack Doors Open Signing ISS RS Handover Protocol On-Board Training (OBT) Dragon Emergency Review Combustion Integrated Rack Manifold Bottle Replacement Ultrasound 2 HRF Rack 1 Power On Crew Departure Preparations for Return to Earth Rodent Research Node 2 Camcorder Video Setup Combustion Integrated Rack Upper Rack Doors Close Rodent Research Microgravity Science Glovebox LSAH Setup Terminate Soyuz 733 Samsung PC Battery Recharge VHF2 Comm Test from Soyuz 733 via RGS Health Maintenance System (HMS) Ultrasound 2 Scan Prep Health Maintenance System (HMS) Ultrasound 2 Scan Health Maintenance System (HMS) Ultrasound 2 Data Export Group Combustion Module (GCM)  Gas Bottle Unit Air (GBU) Leak Check Public Affairs Office (PAO) High Definition (HD) Config LAB Setup Change of Command Health Maintenance System (HMS) Stow Reminder HRF Generic Ambient Blood Collection Reminder Rodent Research Thermal Consideration Soyuz 733 [СА] cooling down prior to descent Reminder 1 HRF Generic Saliva Collection Completed Task List Items None Ground Activities All activities were completed unless otherwise noted. RR5 Habitat Install support Change of Command  Three-Day Look Ahead: Friday, 06/02: 49S undock/landing, OBT Dragon vehicle ops, Zbook deploy Saturday, 06/03: Crew off duty, housekeeping Sunday, 06/04: SpX-11 capture/berthing/vestibule outfitting QUICK ISS Status – Environmental Control Group:   Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off           [СКВ] 2 – SM Air Conditioner System (“SKV2”) Off Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Manual Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Process Trace Contaminant Control System (TCCS) Lab Full up Trace Contaminant Control System (TCCS) Node 3 Off  

June 02, 2017 at 12:00AM
from NASA http://ift.tt/2rjeRdK
via IFTTT

LightSail 2 partner spacecraft ships safely to New Mexico

Jason DavisJune 2, 2017

LightSail 2 partner spacecraft ships safely to New Mexico

Georgia Tech's Prox-1 spacecraft shipped safely to the Air Force Research Laboratory in Albuquerque, New Mexico last weekend, marking a key milestone for the SmallSat that will carry The Planetary Society's LightSail 2 into space.

More than 200 Georgia Tech students and faculty members have worked on the project since its inception in 2012. 

"The shipment of Prox-1 is a major milestone, and an important step on the long path to launch," said Dave Spencer, the mission manager for Prox-1, who also serves as the project and mission manager for LightSail 2. "The students have worked incredibly hard to get to this point."

Together, Prox-1 and LightSail 2 will hitch a ride on the second flight of SpaceX's Falcon Heavy rocket, which will carry a larger payload for the U.S. Air Force. Launch is currently not expected until at least December 2017.

Once in orbit, Prox-1 will deploy LightSail 2, after which LightSail 2 will attempt to perform the first controlled solar sail flight in Earth orbit—and the first-ever by a CubeSat.

The two spacecraft will soon be ready to meet for the first time, ahead of a summer of testing to make sure they can withstand the rigors of spaceflight.

LightSail 2 and Prox-1

Josh Spradling / The Planetary Society

LightSail 2 and Prox-1

Prox-1 deploys the LightSail 2 spacecraft in Earth orbit.

The entirety of Prox-1's life thus far has been spent in a clean room on the third floor of a building on the Georgia Tech campus in Atlanta, Georgia. Last week, the spacecraft began its long journey to the launch pad.

"It's kind of like kissing your kids goodbye when they go to college," said Glenn Lightsey, the Prox-1 principal investigator. Lightsey, who recently transitioned to the role, replaced Spencer, who accepted an associate professorship at Purdue University. 

Getting Prox-1 from Atlanta to Albuquerque was no small task, Lightsey told me.

"It's a day process just to get it from the clean room to the hallway, which is 12 feet away," he said.

Prox-1 is the size of a small washing machine, and weighs about 70 kilograms. While some parts of the spacecraft are designed to absorb the forces of launch, other pieces are delicate, and the spacecraft can't be moved like a piece of furniture. 

A large, white container marked "FRAGILE" encapsulated Prox-1 as it was extracted from its clean room, barely clearing a door that had to be removed from the hinges.

Prox-in-a-box

Georgia Tech

Prox-in-a-box

Undergraduate Georgia Tech student Grayson Huggins stands next to Prox-1 shortly before its shipment to the Air Force Research Laboratory in Albuquerque, New Mexico.

Another factor complicating the Prox-1 move was that the spacecraft’s building has no elevator. The only option was to take the stairs.

That part of the shipment was handled by Georgia Rigging, a company specializing in complex equipment moves. Lightsey said the company brought in a robotic stair-climbing device for the job. 

From there, Prox-1 was wheeled out onto a loading dock, and loaded into a climate-controlled FedEx truck for its long drive out to New Mexico.

For the next month, the spacecraft will undergo further testing at the Air Force Research Laboratory. In July, LightSail 2 is scheduled to depart from Cal Poly San Luis Obispo. The two spacecraft will then be integrated in Albuquerque and tested as a single unit before launch. 

Prox-1 team members

Georgia Tech

Prox-1 team members

Several current Prox-1 team members pose with former principal investigator Dave Spencer during a recent campus visit.

MER
Let's Change the World

Become a member of The Planetary Society and together we will create the future of space exploration.

Join Today

Emily Lakdwalla
The Planetary Fund

Support enables our dedicated journalists to research deeply and bring you original space exploration articles.

Donate



from Planetary Society Blog http://ift.tt/2slGfXc
via IFTTT