Main Bus Switching Unit (MBSU) 3 Status: Following yesterday’s MBSU 3 failure, troubleshooting was not successful and the Flight Investigation Team (FIT) determined MBSU 3 is failed. The crew and ground teams coordinated the install of the Node 1 Y-Jumper and Node 1 Contingency Power Jumper and removal of the Node 1 Channel 2 and …
May 01, 2019 at 12:00AM
from NASA https://go.nasa.gov/2V5stKa
via IFTTT
沒有留言:
張貼留言