Crew Reduced Duty Day: Today was a reduced duty day for the US crew in advance of tomorrow’s EVA. Extravehicular Activity (EVA) Preparations: The US crew members conducted final preparations to the Equipment Lock, Extravehicular Mobility Units (EMUs), and ancillary hardware. They also reviewed related procedures and briefing packages then conducted a conference with the ground to answer any questions. US EVA #33 (P6 Return To Original Configuration) is scheduled to occur tomorrow with hatch opening taking place at approximately 6:15am CST. Reaction Self Test: Kelly completed two sessions today for the Reaction Self Test investigation, one after he woke up in the morning and one prior to his sleep period. These sessions, and an additional late session on Friday, were scheduled to provide data in close proximity to the extravehicular activity (EVA) planned for this Friday. Reaction Self Test helps crewmembers objectively identify when their performance capability is degraded by various fatigue-related conditions that can occur as a result of ISS operations and time in space (e.g., acute and chronic sleep restriction, slam shifts, EVA, and residual sedation from sleep medications). Space Headaches: Yui and Lindgren completed their weekly Space Headaches questionnaires today. Headaches can be a common complaint during spaceflight. The Space Headaches experiment will provide information that may help in the development of methods to alleviate associated symptoms and improvement in the well-being and performance of crew members in space. Urine Processing Assembly (UPA) Status: Yesterday, the crew transferred a tank (EDV) of Russian pretreated urine to the UPA Wastewater Storage Tank Assembly (WSTA). The quantity transferred was unexpected. Today, the crew reported that when they tried to perform another EDV transfer, the transfer hose had air bubbles in it and liquid was not flowing. The problem appears to be a leak in the bladder of the EDV that was transferred yesterday which allowed air to enter the hose, the WSTA and the recycle tank. To remove as much of the air as possible from the UPA, the crew drained the WSTA and the recycle tank that was removed yesterday as well as the recycle tank that had been installed today. They also replaced the EDV transfer hose. Food Warmer Inspection: Yui performed an annual inspection of the US Food Warmer located within the Service Module. While performing this activity, he photo documented wear indications and succesfully performed a powered functional test. Today’s Planned Activities All activities were completed unless otherwise noted. Reaction Self-Test (morning) Extravehicular Activity (EVA) Reminder for EVA In-Suit Light Exercise (ISLE) Preparation ISS crew and ГОГУ (RSA Flight Control Management Team) weekly conference COSMOCARD. Setup. Starting 24-hr ECG Recording Repairs of SM Interior Panel 317 by Installing Overlay Panels – Day 1 Pre-EVA Crew Periodic Health Status Examination Filling (separation) of EDV (KOV) for Elektron or EDV-SV. Inspect and separate EDV-SV No.1002 п.37 (00053403R, ФГБ1ПГО_1_107). For separation use EDV (KOV) No.1199 (00065916R, ФГБ1ПГО_1_109) Crew Health Status before USOS EVA – Data Transfer СОЖ Maintenance. Flushing БКО ECLSS Recycle Tank Remove and Replace On MCC Go СУБА Rate Sensor (ИУС) control sub-network user comm check with RS3, RS2, RS1 Laptops. Ventilation grille cleaning on FGB interior panels (panels 201, 301, 401) HAM radio session from Columbus [Deferred] WRS – Recycle Tank Fill USOS EVA Procedure Review Final printout of USOS EVA procedures WRS – Recycle Tank Fill Pille Sensors prep for USOS EVA TV Conference with the Participants of Voskhod camp space tour PROBOY. RSЕ1 Laptop Ops Rubber valve replacement in dining table on ISS RS PROBOY. Penetration Simulator Ops IMS and Stowage Conference Removal of depress hose for nominal operations [Deferred] EVA Equipment Lock Preparation EXPOSE-R. Copy and Downlink Data WRS – Recycle Tank Fill Cleaning FGB ЦВ1 Circulation Fan Screens USOS EVA Procedure Conference PROBOY. Copy and Downlink Data CONTENT. Experiment Ops Cleaning fan screens on FGB interior panels 116, 316, 231, 431 SHD – Questionnaire Private medical conference before EVA from USOS Post-Exercise Hygiene Procedure CONTENT. Experiment Ops SHD – Questionnaire Reaction Self-Test (evening) Preparation of Reports for Roscosmos Web Site and Social Media ECON-M. Observation and Photography URAGAN Observations and Photography IMS Delta File Prep Completed Task List Items None Ground Activities All activities were completed unless otherwise noted. ETCS Loop B Preparation in support of P6 RTOC EVA Three-Day Look Ahead: Friday, 11/06: P6 RTOC EVA Saturday, 11/07: Post EVA Activities Sunday, 11/08: Weekly Cleaning, Crew Off Duty QUICK ISS Status – Environmental Control Group: Component Status Elektron Off Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) On [СКВ] 2 – SM Air Conditioner System (“SKV2”) Off Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Shutdown Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Standby Trace Contaminant Control System (TCCS) Lab Off Trace Contaminant Control System (TCCS) Node 3 Full Up
November 06, 2015 at 01:08AM
from NASA http://ift.tt/1PeDHSH
via IFTTT
沒有留言:
張貼留言