2015年10月28日 星期三

ISS Daily Summary Report – 10/27/15

Crew Half-Duty Day:  Today was a reduced duty day for the United States On-orbit Segment (USOS) Crew in advance of tomorrow’s EVA.   Extravehicular Activity (EVA) Preparations:  The USOS crew members made final preparations by setting up EVA tools, performing a tool audit, and preparing the Equipment Lock, and Extravehicular Mobility Units (EMUs).  In addition, all three USOS crew reviewed related procedures and briefing packages.  USOS EVA #32 (ISS Upgrades EVA) is scheduled to occur tomorrow with hatch opening taking place at approximately 7:15am CDT.   Plasma Kristall-4 (PK-4) Operations:  Kononenko continued ongoing PK-4 operations by connecting the gas supply flexhose to the Neon gas supply, opening a valve to pressurize it, reporting the pressure, and then disconnecting the flexhose.  An experiment run in PK-4 is planned to start tomorrow.  Plasma Kristall-4 is a complex European Space Agency (ESA) plasma laboratory installed in the Columbus European Physiology Module (EPM) rack and operated by Russian crewmembers.  PK-4 supports research in the field of Complex Plasmas: low temperature gaseous mixtures composed of ionized gas, neutral gas and micron-sized particles. The micro-particles become highly charged in the plasma and interact strongly with each other, which can lead to a self-organized structure of the micro-particles (i.e., “plasma crystals”).   Large Format Motion Picture Camera (IMAX):  Kelly connected the IMAX Codex to a Station Support Computer (SSC) for a downlink of recorded video files.  IMAX filmmakers intend to produce a three dimensional movie called A Perfect Planet, using ISS-based video and images to show how natural and human forces shape planet Earth. The film will also showcase NASA’s exploration efforts and highlight the ISS as a platform for scientific research and a stepping stone to deep space exploration.   Reaction Self-Test:  Kelly completed a session today for the Reaction Self-Test investigation.  Reaction Self-Test helps crewmembers objectively identify when their performance capability is degraded by various fatigue-related conditions that can occur as a result of ISS operations and time in space (e.g., acute and chronic sleep restriction, slam shifts, extravehicular activity (EVA), and residual sedation from sleep medications).   Sleep Log:  Kelly and Kornienko recorded Sleep Log entries today.  The Sleep ISS-12 experiment monitors ambient light exposure and crew member activity and collects subjective evaluations of sleep and alertness.  The investigation examines the effects of space flight and ambient light exposure on sleep during a year-long mission on the ISS.   Urine Processing Assembly (UPA) Status:   Following yesterday’s Fluids Control Pump Assembly (FCPA) change out, today Ground Controllers updated pump parameters and successfully initiated a UPA process cycle.  The process cycle is expected to complete later this evening.   Node 1 Nadir Common Berthing Mechanism (CBM) Checkout:   Yesterday afternoon, Ground Controllers completed a successful checkout of the Node 1 Nadir CBM.  This is a routine checkout performed every 6 months, and also serves as Launch Commit Criteria (LCC) for the planned OA-4 berthing in December.   Today’s Planned Activities All activities were coompleted unless otherwise noted. NEIROIMMUNITET. CORRECTSIA RUEXP – Blood Sample Insertion into MELFI Verification and report of antivirus scan results on Auxiliary Computer System (ВКС) laptops Purging Elektron-VM Liquid Unit (БЖ) after Shutdown Replacement of RS TORU trainer cable 17КС.30Ю8230А-2030 cable Progress 429 (SM Aft) Transfers and IMS Ops JEM Terminal Computer Reboot Hair Sample Cleaning ГЖТ4 (Gas-Liquid Heat Exchanger) ВТ-7 fan screen VIBROLAB. Monitoring hardware activation Inspection and Cleaning of RS2 laptops No.1098 (POC22473J,СМ1РО_1_102), RS3 No.1144 (POC22519J,ФГБ1ПГО_4_426_1, bag 352-20 (00037779R) Demating wire harness W0142 On MCC GO RS1 Laptop Inspection and Cleaning Verification of ИП-1 Flow Sensor Position WRS – Recycle Tank Fill from EDV CARDIOVECTOR. Experiment Ops Relocating PBBs for upcoming EVA EVA Tool Config Final printout of EVA procedures ISS Crew Medical Officer (CMO) Computer Based Training (CBT) ABOUT GAGARIN FROM SPACE. Experiment Ops EVA2 Procedure Review Pille sensors prep for USOS EVA On-orbit hearing assessment using EARQ PLAZMENNIY KRISTALL. Gas Exchange in the Chamber for Neon IMAХ – Connecting to SSC USOS EVA Tool Audit WRS – Recycle Tank Fill from EDV Installation of RSK1 SW Version 1.11 and Checkout of TORU Relocation Simulator Wiping SM surfaces with Fungistat:  panels 128, 130, 131, 135 Water Transfer and Shell Compression of Progress 429 (SM Aft) Rodnik БВ1 tank Equipment Lock Preparation HAM radio session from Columbus IMS Delta File Prep СОЖ Maintenance VIBROLAB. Copy and Downlink Data IMAX – Terminate Battery Charge EVA Procedure Conference IMAX – Terminate Codex 512 GB Drive charge 24-hour ECG Monitoring (termination) 24-hour BP monitoring (terminate) IMAX – power down NEIROIMMUNITET. Stress Test NEIROIMMUNITET. Closeout Ops Reaction Self-Test (Sleep) On MCC GO Compression of Progress 429 (SM Aft) Rodnik Tank БВ1 – Closeout Ops Preparation of Reports for Roscosmos Web Site and Social Media ECON-M. Observation and Photography URAGAN Observations and Photography   Completed Task List Items RMS Laptop Terminal 2 (RLT2) Hard Disk Drive Installation RMS Laptop Terminal 3 (RLT3) Swap   Ground Activities All activities were completed unless otherwise noted. EVA Preparation Commanding Backup and Standby C&C MDM Swap S-Band String 1 Activation   Three-Day Look Ahead: Wednesday, 10/28:  ISS Upgrades EVA Thursday, 10/29:  1/2 Duty Day, Post EVA activities, Plant gravity Sensing 2, VIABLE Training Friday, 10/30: EVA Preparation, JEMAL ExHAM install.   QUICK ISS Status – Environmental Control Group:                               Component Status Elektron Off Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off [СКВ] 2 – SM Air Conditioner System (“SKV2”) On Carbon Dioxide Removal Assembly (CDRA) Lab Off Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Shutdown Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Norm Trace Contaminant Control System (TCCS) Lab Off Trace Contaminant Control System (TCCS) Node 3 Full Up  

October 28, 2015 at 12:53AM
from NASA http://ift.tt/1N7i2dk
via IFTTT

沒有留言:

張貼留言