2015年7月15日 星期三

ISS Daily Summary Report – 07/14/15

NanoRack Cubesat Deployer (NRCSD) Operations:  Overnight there was an issue with a NRCSD deploy. Ground teams sent the command but only one door opened. Later during a night pass it was discovered that the CubeSat had deployed. Ground teams met and agreed to go forward with an additional deploy which was completed successfully. So far 8 of 16 Cubesats have been deployed. The complement consists of 14 Planet Lab Doves, 1 Arkyd-3 and 1 Centennial-1 satellite.  Integrated Resistance and Aerobic Training Study (Sprint) Portable Pulmonary Function System (PPFS):  Kelly set up the Portable PFS (Pulmonary Function System) power, data, front panel, and gas connections from a temporary stow deployed position and configured the PPFS Mixing Bag System (MBS) in preparation for the Sprint session scheduled for Wednesday.  Sprint evaluates the use of high intensity, low volume exercise training to minimize loss of muscle, bone, and cardiovascular function in International Space Station (ISS) crewmembers during long-duration missions. Ultrasound scans are used to evaluate spaceflight-induced changes in the muscle volume. Radiation Dosimetry Inside ISS-Neutrons (Radi-N):  Kornienko handed Radi-N hardware to Kelly who then distributed the eight bubble detectors in the Columbus module and took closeout photos of the detectors in the deployed locations.  The objective of this investigation is to better characterize the ISS neutron environment and define the risk posed to crewmembers’ health and provide the data necessary to develop advanced protective measures for future space flight.  For each session, 8 detectors are initialized and deployed in predetermined locations for measurements: a set of 6 spectrometric detectors and two control detectors are placed on a wall of a ISS Segment. After 7 days the detectors are collected and read using the BUBBLE reader. Carbon Dioxide Removal Assembly (CDRA) Status: Node 3 (N3) CDRA: Today, ground controllers successfully commanded the N3 CDRA Air Selector Valve (ASV) 104 to position B.  N3 CDRA was activated and is currently operational.  Ground teams will continue to monitor ASV 104 performance and if necessary, a Removal & Replacement (R&R) will be planned later this week. Vozdukh was commanded to Mode 4 to assist with ppCO2 level management. Lab CDRA: Remote Power Controller Module (RPCM) LAD62B-A Remote Power Controller (RPC) 12, which powers the Lab CDRA valves, continues to experience overcurrent trips.  Yesterday, the RPC stayed closed for over 7 hours before it tripped. Ground controllers are reviewing the data on the most recent trips prior to attempting to reclose the RPC. An R&R of the RPCM is being considered for next week to rule out the RPCM as the source of overcurrent trips. Extravehicular Activity (EVA) Battery Stowage Assembly (BSA) Battery Maintenance:  Kelly initiated battery maintenance for Rechargeable EVA Battery Assembly (REBA), Helmet Light (HL), and Pistol Grip Tool (PGT) Batteries in the Battery Stowage Assembly (BSA) via the Battery Charger Assembly (BCA) using a discharge or an automated combination of charge and discharge cycling. This activity is in preparation for Russian EVA #41 currently scheduled for August 10. Today’s Planned Activities All activities are on schedule unless otherwise noted. 24-hour BP Monitoring (start) r/g 9337 Regeneration of БМП Ф2 Micropurification Cartridge (start) CASKAD. Manual Mixing in Bioreactor / r/g 9277 PILOT-T.  Preparation for the experiment. / r/g  9335 WRS –  Recycle Tank Fill MATRYOSHKA-R. Gathering and Initialization of Bubble-Dosimeter Detectors. / r/g 9327 PILOT-T. Experiment Ops. / r/g 9335 MATRYOSHKA-R. Handover of BUBBLE-dosimeters to USOS / r/g 9327 RADIN – Handover of detectors to USOS for deployment MATRYOSHKA-R. BUBBLE-dosimeter initialization and deployment. / r/g 9327 RADIN – Deployment of detectors WRS Water Sample Analysis PILOT-T. Experiment Ops. / r/g 9336 IDENTIFIKATSIYA. Copy ИМУ-Ц micro-accelerometer data to laptop / r/g 8732 PILOT-T.  Experiment Ops. / r/g 9334 [Deferred] Start BSA Battery Maintenance Cycling Preparing for ЗУ2А Replacement (ЭА025М) in FGB r/g 9333 NANO – Installation of  Ethernet cable [Deferred] Preparing for installation of ПН28-120 voltage converter r/g 9328 PILOT-T. Closeout Ops. / r/g 9334 [Deferred] PAO crew prep / r/g 9338 TV-PAO Event with Channel One and CNN r/g 9338 Semi-annual BRI cleaning (this includes cleaning filter, power supply unit, and fan unit). r/g 9329 TOCA Data Recording CWC Relocation Verification of ИП-1 Flow Sensor Position IMS Delta File Prep PAO Event Preventive Maintenance of FS1 Laptop (Cleaning and rebooting) / r/g 9331 Testing comm between modules. / r/g 9330 VHF1 Comm Test via US Ground Sites (AFRC, WHI) from SM SPRINT – Hardware Setup CASKAD. Manual Mixing in Bioreactor / r/g 9277 Regeneration of Micropurification unit (БМП) Ф2 cartridge (end) Completed Task List Items None Ground Activities All activities are on schedule unless otherwise noted. NanoRacks platform HD video Three-Day Look Ahead: Wednesday, 07/15: Sprint ops, VEG-01 plant thinning, JEM mesh cover-return grille cleaning, SSC 20 and 23 loading prep for 43S crew Thursday, 07/16: JEMRMS/CubeSat activities, SPHERES Slosh review, N3 CDRA leak check Friday, 07/17: SPHERES Slosh run QUICK ISS Status – Environmental Control Group:                               Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off [СКВ] 2 – SM Air Conditioner System (“SKV2”) On Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Shutdown Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Standby Urine Processing Assembly (UPA) Standby Trace Contaminant Control System (TCCS) Lab Off Trace Contaminant Control System (TCCS) Node 3 Full Up  

July 15, 2015 at 12:59AM
from NASA http://ift.tt/1Linusc
via IFTTT

沒有留言:

張貼留言