2014年9月2日 星期二

ISS Daily Summary Report – 08/29/14

FLame Extinguishment Experiment (FLEX)-2 Operations: Flight Engineer (FE)-5 Wiseman removed the Combustion Integration Rack (CIR) alignment guides which isolated the rack, allowing ground teams to conduct another FLEX-2 test point via ground commanding. A toluene and heptane mixture was used for this test point. FLEX-2 uses small droplets of fuel to study the special burning […]



August 30, 2014 at 12:51AM

from NASA http://ift.tt/1rdBz09

via IFTTT

沒有留言:

張貼留言